I do /paste base_01 and it is a bit too high
Then I do /paste base_01 height -1 but its way too low, but if I change it to -0.1 or -0.0001 its never quite right
Is there any way to add ghosting so we see the foundation height before paste? or maybe make it so the foundation will always paste the right heigh
Then I do /paste base_01 height -1 but its way too low, but if I change it to -0.1 or -0.0001 its never quite right
Is there any way to add ghosting so we see the foundation height before paste? or maybe make it so the foundation will always paste the right heigh